Renovations update for 2024 to 2025

The pictures show the outcome of works that were carried out in Shrule Church over the period of 2024 and 2025 when the dry lining of the old section of the building was removed, the exposed stone cleaned and pointed. Upon completion of this, the timber ceiling of the old section of the church was painted along with the main body of the church. This was then followed by removal of the old carpet, and the cleaning and lacquering of the old timber floor from the 1930s.